Bay Park Wastewater Treatment Plant

Agency: Nassau County Department of Public Works
Location: Nassau County, New York
Cost of Construction: $550 million
Completion Date: 2019
As a subconsultant to the Hazen & Sawyer/Arcadis joint venture, CSM provided engineering and administrative support staff for this project.
Our staff provided supervision of work flow, rehabilitation and repair at the Bay Park and Cedar Creek Sewage Treatment Plants. Our staff also provided supervision at additional locations inclusive of Odor Control Facilities and Pump Stations throughout Nassau County.
The project scope for the 26 pump stations called for: demolition and restoration, removal of generators, and removal and installation of all new electric for lighting and power. Work also included redirection of 3 - 6 inch chemical piping and removal and installation of a 36 inch drainage pipe.
CSM expedited reregistration and removal of in-ground fuel tanks. At the Odor Control Facility our staff provided supervision of the installation of 500 grout piles, layout of 16” and 2 - 8” F.P.W.
Other Featured Projects
CSM has served as a subconsultant to the Hazen and Sawyer, Malcolm Pirnie and Greeley and Hansen JV team for the past 20 years.
As a subconsultant to Malcolm Pirnie, Inc., CSM provided professional construction engineering inspection services related to the construction of the North River Water Pollution Control Plant located on the Hudson River.
As a subconsultant to GPI, CSM performed construction engineering inspection services on this $165 million project.
As a subconsultant to LKB, Inc., CSM provided resident engineering inspection services and a community liaison person for community participation on this project.
As a subconsultant to the URS (acquired by AECOM)/Arcadis team, CSM Engineering provided services at the plant for 16 years, beginning in 2003.
CSM’s staff provided inspection services for demolition of existing digesters as well as the excavation, sheeting and pile foundation for the new residual facilities.
CSM provided supervision for the Hicksville Hamlet Beautification Projects Phases I and II, for the Town of Oyster Bay Department of Public Works and Department of Intergovernmental Affairs.
CSM Engineering provided professional engineering design, construction engineering inspection and supervision services for the Village of Island Park.
As a subconsultant to Lane/Schiavone, CSM is providing quality management services for a Design-Build project that will lengthen 9 bridges over the Van Wyck Expressway.
CSM served on a panel assembled by Procifico Partners, to review a future Contract 9 for the Williamsburg Bridge. We provided our expertise in construction management during this value engineering study.
As a subconsultant to Nelson & Pope, CSM is providing construction inspection services on a Governor’s Office of Storm Recovery (GOSR) project focused on waterfront resiliency improvements.
As a subconsultant to Arcadis, CSM is providing construction management and inspection services for biological nutrient removal updates at the Rockaway and Coney Island Wastewater Treatment Plants.
As a subconsultant to the Hazen & Sawyer/Arcadis joint venture, CSM provided engineering and administrative support staff for this work flow, rehabilitation and repair project.
CSM is providing third-party review of the demolition procedures being proposed by the Contractor, Skanska, as part of the rehabilitation of the Ed Koch Queensboro Bridge under Contract 10.
As a subconsultant to Jacobs Engineering, CSM provided mechanical, plumbing and fire-protection inspection services for the rehabilitation of the Student Union building at Stony Brook University.
As a subconsultant to NV5, CSM is providing construction inspection services for priority surface treatments for NYSDOT assets in Region 10.
As a subconsultant to NV5, CSM provided construction engineering inspection services on this Design-Build project located in the Town of Babylon.
CSM is providing electrical, mechanical, civil, architectural, and environmental health and safety inspection services for wastewater plants managed by the Bureau of Wastewater Treatment.
As a subconsultant to LKB, CSM provided inspection services of the contractor’s work for the installation of electronic devices and requisite wiring.
As a subconsultant to HDR, CSM provided sewer inspection for this infrastructure project aimed to mitigate flooding in Chandler Street and the surrounding community.