CROTON WATER FILTRATION PLANT

Agency: New York City Department of Environmental Protection
Location: The Bronx, New York
Cost of Construction: $3.7 billion
Completion Date: 2019
The Croton Water Filtration Plant is a 400,000 square foot facility located beneath The Mosholu Golf Course, in the Bronx. Croton is the city’s smallest and oldest water supply system, and processes a third of NYC’s drinking water. The plant has the capacity to filter up to 290 million gallons of water each day. However, an average of 100 million gallons are filtered per day.
As a subconsultant to the URS (acquired by AECOM)/Arcadis team, CSM Engineering provided services at the plant for 16 years, beginning in 2003. We provided construction engineering inspection, electrical, mechanical, and civil inspections, architectural coordination and technical support. Some of the work included: construction of a raised bore shaft; building a new shaft and meter chamber; performing pipe torque sequence procedures for TW pipes; excavation; removal and disposal of rock and dirt to create a 600 ft x 700 ft wide and 80 ft deep pit; and the excavation of two tunnels connecting the pit to the water source.
Our staff performed mechanical inspection of equipment and piping installations including chemical metering, sludge, raw and treated water, and dissolved air flotation pumps. Piping systems inspections consisted of ductile iron, stainless steel, PVC and CPVC varying in size from 1” to 144” in diameter, installation of drainage pipes as well as new and refurbished sluice gates, new concrete walls and slabs. We observed various concrete pours and assured that the concrete was properly vibrated. Inspected rebar placement in accordance with approved shop drawings for foundations; interior and exterior masonry; walls and floor decks; and inspected roofing and ceiling installations. Our staff also conducted routine and scheduled site safety inspections; inspection for the conformance of work with the plans and specifications; prepared and maintained daily inspection reports; maintained payment records; contractor's time and material sheets; reviewed contractor's partial payment requests, and maintained as-built drawings of the work.
Other Featured Projects
CSM has served as a subconsultant to the Hazen and Sawyer, Malcolm Pirnie and Greeley and Hansen JV team for the past 20 years.
As a subconsultant to Malcolm Pirnie, Inc., CSM provided professional construction engineering inspection services related to the construction of the North River Water Pollution Control Plant located on the Hudson River.
As a subconsultant to GPI, CSM performed construction engineering inspection services on this $165 million project.
As a subconsultant to LKB, Inc., CSM provided resident engineering inspection services and a community liaison person for community participation on this project.
As a subconsultant to the URS (acquired by AECOM)/Arcadis team, CSM Engineering provided services at the plant for 16 years, beginning in 2003.
CSM’s staff provided inspection services for demolition of existing digesters as well as the excavation, sheeting and pile foundation for the new residual facilities.
CSM provided supervision for the Hicksville Hamlet Beautification Projects Phases I and II, for the Town of Oyster Bay Department of Public Works and Department of Intergovernmental Affairs.
CSM Engineering provided professional engineering design, construction engineering inspection and supervision services for the Village of Island Park.
As a subconsultant to Lane/Schiavone, CSM is providing quality management services for a Design-Build project that will lengthen 9 bridges over the Van Wyck Expressway.
CSM served on a panel assembled by Procifico Partners, to review a future Contract 9 for the Williamsburg Bridge. We provided our expertise in construction management during this value engineering study.
As a subconsultant to Nelson & Pope, CSM is providing construction inspection services on a Governor’s Office of Storm Recovery (GOSR) project focused on waterfront resiliency improvements.
As a subconsultant to Arcadis, CSM is providing construction management and inspection services for biological nutrient removal updates at the Rockaway and Coney Island Wastewater Treatment Plants.
As a subconsultant to the Hazen & Sawyer/Arcadis joint venture, CSM provided engineering and administrative support staff for this work flow, rehabilitation and repair project.
CSM is providing third-party review of the demolition procedures being proposed by the Contractor, Skanska, as part of the rehabilitation of the Ed Koch Queensboro Bridge under Contract 10.
As a subconsultant to Jacobs Engineering, CSM provided mechanical, plumbing and fire-protection inspection services for the rehabilitation of the Student Union building at Stony Brook University.
As a subconsultant to NV5, CSM is providing construction inspection services for priority surface treatments for NYSDOT assets in Region 10.
As a subconsultant to NV5, CSM provided construction engineering inspection services on this Design-Build project located in the Town of Babylon.
CSM is providing electrical, mechanical, civil, architectural, and environmental health and safety inspection services for wastewater plants managed by the Bureau of Wastewater Treatment.
As a subconsultant to LKB, CSM provided inspection services of the contractor’s work for the installation of electronic devices and requisite wiring.
As a subconsultant to HDR, CSM provided sewer inspection for this infrastructure project aimed to mitigate flooding in Chandler Street and the surrounding community.